Pressing
1, Glass tin side should be connected with SGP interlayer, if cannot be connected, glass air side surface must be spread evenly by the adhesion. (adhesion cannot be spread by SGP film)
Autoclave
1,holding time at least 150mins, temperature: 135-138℃
Pressure: normal
2, glass distance cannot below 3cm
3, cooling speed should be fast.